Transmission
- Technical of interconnection study by ENTRESA, the national grid operator, initiated in June 2007
- First draft of transmission connection study shows available capacity in the existing 230 KV transmission line between Masaya, Nicaragua and Liberia, Costa Rica
- In most recent discussions, electricity planners and regulators have shown willingness to accept wind power at low penetration levels and are open to learning how to manage a higher percentage of windpower